Making Cross-Border Design More Efficient & Reliable

6-Step Creative Control Guarantee

01

04

The entire design process is structured into 6 mandatory approval milestones. Each phase requires client approval before proceeding, ensuring full creative control and directional accuracy.

Brief Alignment

Client provides a standardized brief and references. Our Account Manager (AM) conducts a deep-dive to clarify core requirements.

Pre-Visualization Review

We deliver pre-visualization drafts with base textures and overall layouts (without detailed polishing, lighting calibration and advanced rendering) for your aesthetic confirmation.

02

Concept & Moodboard

Designers present concept sketches and mood boards. We officially commence the design phase only after aligning on the creative direction.

05

Detailing & Rendering

We polish all structural and material details, calibrate lighting effects and spatial atmospheres, and produce high-fidelity final renders for official client approval.

03

3D Blockout Review

Our 3D designers deliver a 3D blockout (geometry-only draft) to confirm the spatial layout and structural form with the client.

06

Final Asset Delivery

We incorporate your final feedback, polish all details, and deliver the finalized design assets.

Delivery Assurance System

  • 24-hour response for standard requests

  • 4-hour turnaround for urgent tasks

  • 3-level quality control (Designer → PM → Creative Director)

  • Redundant team structure ensures zero project interruption

Risk Reversal Guarantee

If expectations are not met before the final design phase, and after two revision rounds, we will replace the dedicated design team within 24 hours and restart the project at no additional cost.

Milestone-Based Escrow Protection System

We operate on a milestone-based escrow payment system where funds are released only after each stage is approved, ensuring complete financial security for clients.

No milestone proceeds without client approval.

We support secure fund escrow via mainstream global platforms like Stripe, XTransfer, and Payoneer, ensuring a compliant, traceable and transparent financial trail with zero capital risks.

  • 30% — Project Initiation (Resource Allocation & Project Lock)

  • 40% — After Concept Approval (Creative Direction Locked)

  • 30% — After Final Delivery Approval (Full Asset Handover)

Designs are approved in phases. Settlement for the next stage occurs only after the current milestone is accepted, realizing mutual restraint and protecting the legitimate rights and interests of both parties.